Binnies Hong Kong Limited
Drainage Services Department
渠務署
Contract No. DC/2022/03
Yuen Long Barrage and Nullah Improvement Schemes
合約編號 DC/2022/03
元朗防洪壩及明渠改善計劃
The Hong Kong office of BINNIES (formerly known as BLACK & VEATCH) is now seeking applicants to fill the following site staff posts for Contract No. DC/2022/03 – Yuen Long Barrage and Nullah Improvement Schemes. The works include (a) construction of an automatic flood barrier, a stormwater pumping station, a master control centre and the associated electrical and mechanical facilities in the Yuen Long Nullah; (b) modification of the Yuen Long Nullah and drainage improvement works at the intersection of the Yuen Long Nullah and the Yuen Long Bypass Floodway; (c) improvement of flood walls along the Kam Tin River and construction of flood walls along the Yuen Long Nullah and the Sham Chung River; (d) revitalisation of the Yuen Long Nullah between the Shap Pat Heung Road and the location of the barrage; (e) construction of a dry weather flow interception system including a pumping station for water quality improvement and ancillary works. The contract was commenced in May 2023 for completion in 2027Q3.
賓尼斯工程顧問有限公司 (前名為博威工程顧問有限公司) 就合約編號為DC/2022/03的工程 -「元朗防洪壩及明渠改善計劃」誠聘下列駐地盤工程人員。工程包括(a) 在元朗明渠建造自動防洪屏障、雨水泵房、總控制中心及相關機電設施;(b) 改建元朗明渠及在元朗明渠與元朗排水繞道交匯處進行雨水排放系統改善工程;(c) 在錦田河改善防洪牆及在元朗明渠及深涌河建造防洪牆;(d) 活化一段位於至十八鄉路至防洪壩位置的元朗明渠;(e) 建造包括一所泵房的旱季截流系統以改善水質及進行附屬工程。合約已於2023年5月展開,於2027年第3季完成。
香港及亞洲No.1 新世代招聘平台™